[1]
“Design of a Mixed-Zone Completion Using a Single Oil Production Column in a Non-Eruptive Well with Two Oil and Gas Reservoirs”, ITEB, vol. 3, no. 2, pp. 78–84, Jul. 2026, doi: 10.69882/adba.iteb.2026076.