“Design of a Mixed-Zone Completion Using a Single Oil Production Column in a Non-Eruptive Well With Two Oil and Gas Reservoirs”. 2026. Information Technology in Economics and Business 3 (2): 78-84. https://doi.org/10.69882/adba.iteb.2026076.