Design of a Mixed-Zone Completion Using a Single Oil Production Column in a Non-Eruptive Well with Two Oil and Gas Reservoirs. (2026). Information Technology in Economics and Business, 3(2), 78-84. https://doi.org/10.69882/adba.iteb.2026076